Division 07 - Thermal and Moisture Protection

​​​​​​​​​​DISC​​​​LAIMER: These files are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these files.​

At the ​start of each project, consultants must download the current revision of all files that apply to the project. ​​​


​Des​​ign ​Guidelines

​F​​ile​​

​Revision Date

Minimum Design Standards for Roofing Systems

​2/6/2017

Permanent Ladder Installation Guideline​s​

​​5/4/2016

Vegetated Roof System Guidelines

​10/1/2012

​​​

Gu​​arantees

​File​

​​Revision Date

1 Year Roof Guarantee

​10/1/2012

​​2 Year Roof G​uarantee

​10/1/2012

​5 Year Metal Roof Wall Guarantee

​10/1/2012

5 Year Plaza Deck Guarantee

​10/1/2012

5 Year Roof Guarantee

​10/1/2012

10 Year Fluid Coating Guarantee

​​10/1/2012

10 Year Metal Roof Wall Guarantee

​10/1/2012

10 Year Plaza Deck Guarantee​

​10/1/2012

15 Year Fluid Coating Guarantee

​10/1/2012

15 Year Fluoro-Polymer Coating Guarantee

​10/1/2012

20 Year Fluid Coating Guarantee

​10/1/2012

20 Year Metal Roof Wall Guarantee

​10/1/2012

​20 Year Vegetated Roof Guarantee

​10/1/2012

​​​

Specif​​i​​cations


​File​​

Revision Date

​​Division 07 All Specifications

​11/22/2024​
07 05 05 - Selective Demolition for Thermal and Moisture Protection

​11/22/2024

​07 08 00 - Commissioning of Thermal and Moisture Protection

​2/27/2015

​07 10 16 - ​​Waterproofing for Utilities

​11/18/2022

07 18 13.01 - Fluid Applied Pedestrian Deck Coatings

​2/6/2017

07 18 16.01 - Fluid Applied Vehicular Deck Coatings

​2/6/2017

07 31 13 - Asphalt Shingles

​2/6/2017

07 31 24 - Granular Coated Steel Shingle

​2/6/2017

​07 31 29 - Wood Shingle and Shakes

​2/6/2017

07 33 63.01 - Vegetated Roof (Hot Fluid Applied Membrane)

​2/6/2017

07 33 63.02 - ​Vegetated Roof (Thermoplastic Single-Ply Protected Membrane)

​2/6/2017

07 33 63.03 - Vegetated Roof (Thermoplastic Single-Ply Membrane)

​2/6/2017

07 51 13 - ​Built-Up Asphalt Roofing

​2/6/2017

07 53 23.01 - EPDM Roofing - Ballasted

​11/1/2024

07 53 23.02 - EPDM Roofing - Adhered

​11/8/2024

07 61 13 - ​Standing Seam Sheet Metal Roofing

​2/6/2017

​​07 63 00 - ​Sheet Metal Roofing Specialties

​​2/6/2017​

07 84 00 - Fire Stopping

​12/1/2014

​​​​​​​​

D​et​​ails

​File​​​

​Revision Date

Division 07 All Details

​10/29/2015

Asphalt Shingle Details (.DWG)

​1/28/2015​

Asphalt Shin​gle Details​

​1/28/2015

Ballasted EPDM D​etails (.DWG)

​10/1/2012

Ballasted EPDM Details

​10/1/2012

Built Up Roofing Details (.DWG)

​10/1/2012

Built Up Roofing Details

​10/1/2012

Fully Adhered EPDM Details (.DWG)

​10/29/2015

Fully Adhered EPDM Details

​10/29/2015​

​​​​