Division 31 - Earthwork

​

​​​​​​​​​​​​​​​​DISC​​​​LAIMER: These files are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these files.​ At the ​start of each project, consultants must download the current revision of all applicable files.​​

NOTE: ​Microsoft Edge is unable to download individual files but is able to download the zip folders. Please use Google Chrome to download individual files.​​​

​

D​​​e​sign Guidelines

​File​​

​Revision Date

​​​Civil and Sitework Guidelines

​​4/28/2016


S​pecifications

​

D​​etails

​File​​ 

​Revision​ Date

​​Division 31 All Details

​8/1/2017

​Erosion Mat Installation (.DWG)

​8/1/2017

​Erosion Mat Installation

​8/1/2017

​Inlet Protection, Type D (.DWG)

​8/1/2017

​Inlet Protection, Type D

​8/1/2017

​Medium Rip Rap Installation (.DWG)

​8/1/2017

​Medium Rip Rap Installation

​8/1/2017

​Sediment Sock (.DWG)

​8/1/2017

​Sedi​ment Sock​

​8/1/2017

​Silt Curtain (.DWG)

​8/1/2017

​Silt Curtain

​8/1/2017

​Silt Fence (.DWG)

​8/1/2017

​Silt Fence

​8/1/2017

​Stone D​itch Check (.DWG)

​8/1/2017

​Stone Ditch Check

​8/1/2017

​Temporary Ditch Check Using Erosion Bales (.DWG)

​8/1/2017

​Te​mporary Ditch Check Using Erosion Bales

​8/1/2017

​Tracking Pad (.DWG)

​8/1/2017

​Tracking Pad

​8/1/2017

​Tree Protection Fencing (.DWG)

​8/1/2017

​Tree Protection Fenci​ng

​8/1/2017​​

​​​

Back to top button