Division 11 - Equipment - Master Specifications/Design Guidelines

​​DISCLAIMER:  These files are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these specifications.

At the ​start of each project, consultants must download the current revision of all DFD files that apply to the project. There are two ways to download the files:

  1. Download individual files from DFD's Master Specification website. Right click on the file name and choose Save link as. Repeat this for all applicable files.
  2. Download multiple files simultaneously from DFD's file Transfer Protocol (FTP) site. Open your File Explorer program and type ftp://doaftp1380.wi.gov/master_spec​ into the address bar. Copy the applicable files to your computer. Division 01 files are not ava​ilable on the FTP site and must be downloaded from the Division 01 Master Specification website.​

 

Equipment - Design Guidelines - Division 11

File Name​File Title​Rev. Date
​Equip Design Std.docx​​Equipment Design Standards​​10/1/2012


Equipment - Master Specifications - Division 11

File NameFile TitleRev. Date
11 08 00.docx​Commissioning of Equipment​2/27/2015
11 53 13.docx​Laboratory Fume Hoods​2/20/2020