Division 30 - Common Work Results for All Exterior Work - Master Specifications

​​DISCLAIMER:  These files are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these specifications.

At the ​start of each project, consultants must download the current revision of all DFD files that apply to the project. There are two ways to download the files:

  1. Download individual files from DFD's Master Specification website. Right click on the file name and choose Save link as. Repeat this for all applicable files.
  2. Download multiple files simultaneously from DFD's file Transfer Protocol (FTP) site. Open your File Explorer program and type ftp://doaftp1380.wi.gov/master_spec​ into the address bar. Copy the applicable files to your computer. Division 01 files are not ava​ilable on the FTP site and must be downloaded from the Division 01 Master Specification website.​


Common Work Results for all Exterior Work - Design Guidelines - Division 30

File Name​File Title​Rev. Date
cvlGUIDEs.pdfCivil and Sitework Guidelines​​4/28/2016

 

Common Work Results for all Exterior Work - Master Specifications - Division 30

​File NameFile TitleRev. Date
​30 05 00.docx​Common Work Results for all Exterior Work​9/1/2015

*Insert this single specification Section under Division 30 to encompass all common work results for Divisions 31, 32 & 33.