Division 22 - Plumbing

​​​​​​​​DISC​​​​LAIMER: These files are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these files.​

At the ​start of each project, consultants must download the current revision of all files that apply to the project. 

Multiple files may be downloaded simultaneously using DFD's File Transfer Protocol (FTP) site. To access the FTP site, open your File Explorer program and type ftp://doaftp1380.wi.gov/master_spec​ into the address bar. Please note that Division 01 files are not available on the FTP site.


Design ​Guidelines

​File​

​​Revision Date

Areas with Floor Drains Design Guidelines

​​3/31/2016

Domestic Water Pipe Sizing Instructions

​7/15/2021​

​​DSPS Code Water Conversion Tables

​7/15/2021

​​Plumbing and Fire Suppression Design Guidelines

​​10/1/2012

PSI Loss Tables

​7/15/2021

​​

Spec​​​ifications​

​File​

​​Revision Date

​​22 05 00 - Common Work Results for Plumbing

​11/1/2019

22 05 13 - Common Motor Requirements for Plumbing

​​10/1/2012

​​22 05 14 - ​Plumbing Specialties

​​10/1/2012

22 05 15 - Piping Specialties​

​​10/1/2012

​​22 05 23 - ​General Duty Valves for Plumbing Piping

1/31/2024

22 05 29 - ​​Hangers and Supports for Plumbing Piping and Equipment

​​3/17/2023

​​22 07 00 - ​Plumbing Insulation

​​10/1/2012

​​22 08 00 - ​​Commissioning of Plumbing

​​12/1/2016

22 10 13 - Facility Fuel Piping

​​10/1/2012

​​22 11 00 - ​Facility Water Distribution

​​10/10/2017

22 13 00 - Facility Sanitary Sewerage

​​4/6/2018

​​22 14 00 - Facility Storm Drainage

​4/6/2018

​​22 15 13 - General Service Compressed Air Piping

​​10/1/2012

​​2​2 30 00 - ​​Plumbing Equipment

​​10/16/2017

22 42 00 - Commercial Plumbing Fixtures

​10/1/2012

​​22 50 00 - ​​Pool, Aquarium, and Fountain Plumbing Systems

​​10/1/2012

​​22 60 00 - ​​Gas and Vacuum Systems for Laboratories and Healthcare Facilities

​2/4/2020

22 67 ​00 - Processed Water Systems for Laboratories and Healthcare Facilities

​​​10/1/2012

​​​

D​​et​ails

​File​​​​​

​Revisio​n Date

Fixture Connection Stub Out Piping Detail (.DWG)

​10/18/2017

​​Safing Details (.DWG)

​​8/22/2017

​​​​