Division 31 - Earthwork - Master Specifications / Design Guidelines


DISCLAIMER:  These master specifications/design guidelines are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these specifications.

All *.docx documents listed below are Microsoft Word 2010 format. To download a file directly to your computer from the site, right click on the file and choose "Save Target As".  Some browsers may not open .docx files directly but will require you to save the document before viewing it due to security settings.  For instructions for changing the security settings to enable you to open the files directly in IE8 click IE8 Sec Ins.pdf.

Please Note:  If you wish to download multiple files from this master specification, you may do so by going to the DOA FTP Site.  This FTP area is setup for anonymous use.  You will need to use an FTP Client or after clicking on the DOA FTP Site link above, follow the instructions at the top of the ftp page to Open FTP Site in Windows Explorer to download multiple files.

Earthwork - Design Guidelines - Division  31
File Name File Title Rev. Date
cvlGUIDEs.pdf Civil and Sitework Guidelines 4/28/2016

Earthwork - Master Specifications - Division  31
File Name File Title Rev. Date
31 10 00.docx Site Clearing 2/17/2016
31 13 00.docx Selective Tree and Shrub Removal and Transplanting 2/17/2016
31 13 16.docx Selective Tree and Shrub Protection and Trimming 2/17/2016
31 20 00.docx Earthmoving 9/1/2015
31 22 16.15.docx Roadway Subgrade Preparation 3/9/2016
31 23 16.13.docx Trenching 3/10/2017
31 23 16.16.docx Structural Excavation for Minor Structures 9/1/2015
31 23 16.26.docx Rock Removal 9/1/2015
31 23 19.docx Dewatering 9/1/2015
31 25 00.docx Erosion Control 2/17/2016
31 41 16.docx Sheet Piling 10/1/2012

Earthwork - Master Details - Division  31
File NameFile TitleRev. Date
Erosion Mat Installation.dwgErosion Mat Installation CAD Detail8/1/2017
Erosion Mat Installation.pdfErosion Mat Installation PDF Detail8/1/2017
Inlet Protection, Type D.dwgInlet Protection, Type D CAD Detail8/1/2017
Inlet Protection, Type D.pdfInlet Protection, Type D PDF Detail8/1/2017
Medium Rip Rap Installation.dwgMedium Rip Rap Installation CAD Detail8/1/2017
Medium Rip Rap Installation.pdfMedium Rip Rap Installation PDF Detail8/1/2017
Sediment Sock.dwgSediment Sock CAD Detail8/1/2017
Sediment Sock.pdfSediment Sock PDF Detail8/1/2017
Silt Curtain.dwgSilt Curtain CAD Detail8/1/2017
Silt Curtain.pdfSilt Curtain PDF Detail8/1/2017
Silt Fence.dwgSilt Fence CAD Detail8/1/2017
Silt Fence.pdfSilt Fence PDF Detail8/1/2017
Stone Ditch Check.dwgStone Ditch Check CAD Detail8/1/2017
Stone Ditch Check.pdfStone Ditch Check PDF Detail8/1/2017
Temporary Ditch Check Using Erosion Bales.dwgTemporary Ditch Check Using Erosion Bales CAD Detail8/1/2017
Temporary Ditch Check Using Erosion Bales.pdfTemporary Ditch Check Using Erosion Bales PDF Detail8/1/2017
Tracking Pad.dwgTracking Pad CAD Detail8/1/2017
Tracking Pad.pdfTracking Pad PDF Detail8/1/2017
Tree Protection Fencing.dwgTree Protection Fencing CAD Detail8/1/2017
Tree Protection Fencing.pdfTree Protection Fencing PDF Detail8/1/2017