Skip to main content
                                                                                              

Division 07 - Thermal and Moisture Protection - Master Specifications / Design Guidelines


DISCLAIMER:  These master specifications/design guidelines are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these specifications.

All *.docx documents listed below are Microsoft Word 2010 format. To download a file directly to your computer from the site, right click on the file and choose "Save Target As".  Some browsers may not open .docx files directly but will require you to save the document before viewing it due to security settings.  For instructions for changing the security settings to enable you to open the files directly in IE8 click IE8 Sec Ins.pdf.

Please Note:  If you wish to download multiple files from this master specification, you may do so by going to the DOA FTP Site.  This FTP area is setup for anonymous use.  You will need to use an FTP Client or after clicking on the DOA FTP Site link above, follow the instructions at the top of the ftp page to Open FTP Site in Windows Explorer to download multiple files.

Thermal and Moisture Protection - Design Guidelines - Division  07
File NameFile TitleRev. Date
Minimum Design GuidelinesMinimum Design Standards for Roofing Systems2/6/2017
Vegetated Roof Gd.pdfVegetated Roof System Guideline Policy10/1/2012
Permanent Ladder Installation.pdfPermanent Ladder Installation Guideline5/4/2016 

 

Thermal and Moisture Protection - Guarantees - Division  07
File Name File Title Rev. Date
10yr Fluid Coat.pdf 10 yr Fluid Coating Manufacturer's State of Wisconsin Guarantee 10/1/2012
10yr MetalRoofWall.pdf 10yr Metal Roof Wall Guarantee 10/1/2012
10yr PlazaDeck.pdf 10yr Plaza Deck Waterproof Guarantee 10/1/2012
15yr Fluid Coat.pdf 15 yr Fluid Coating Manufacturer's State of Wisconsin Guarantee 10/1/2012
15yr Fluoropoly.pdf 15 yr Fluoropolymer Coating Manufacturer's State of Wisconsin Guarantee 10/1/2012
1yr Roof Guarantee.pdf 1yr Roof Guarantee 10/1/2012
20yr Fluid Coat.pdf 20 yr Fluid Coating Manufacturer's State of Wisconsin Guarantee 10/1/2012
20yr MetalRoofWall.pdf 20yr Metal Roof Wall Guarantee 10/1/2012
20yr Vegetated.pdf 20 yr Vegetated Roof Manufacturer's State of Wisconsin Guarantee 10/1/2012
2yr Roof Guarante.pdf 2yr Roof Guarantee 10/1/2012
5yr MetalRoof Wall.pdf 5yr Metal Roof Wall Guarantee 10/1/2012
5yr Plaza Deck.pdf 5yr Plaza Deck Waterproof Guarantee 10/1/2012
5yr Roof Guarantee.pdf 5yr Roof Guarantee 10/1/2012

Thermal and Moisture Protection Master Specifications - Division  07
File Name File Title Rev. Date
07 08 00.docx Commissioning of Thermal and Moisture Protection 2/27/2015
07 10 16.docx Waterproofing for Utilities 11/3/2016
07 18 13.01.docx Fluid Applied - Pedestrian Deck Coatings 2/6/2017
07 18 16.01.docx Fluid Applied - Vehicular Deck Coatings 2/6/2017
07 31 13.docx Asphalt Shingles 2/6/2017
07 31 24.docx Granular Coated Steel Shingle 2/6/2017
07 31 29.docx Wood Shingle and Shakes 2/6/2017
07 33 63.01.docx Vegetated Roof - Hot Fluid Applied Membrane 2/6/2017
07 33 63.02.docx Vegetated Roof - Thermoplastic Single-Ply Protected Membrane 2/6/2017
07 33 63.03.docx Vegetated Roof - Thermoplastic Single-Ply Membrane 2/6/2017
07 51 13.docx Built-Up Asphalt Roofing 2/6/2017
07 53 23.docx Ethylene-Propylene-Diene-Monomer Roofing 2/6/2017
07 56 63.docxFluid Applied - Over Metal Roofing (Polyurea 2-part)2/6/2017 
07 56 63.01.docx Fluid Applied - Over Metal Roofing (Acrylic) 2/6/2017
07 56 63.02.docx Fluid-Applied - Over Metal Roofing (Kynar-fluoro polymer) 2/6/2017
07 57 13.01.docx Fluid Applied - Over Various Surface Roof (Spray Polyurethane Foam-SPF) (Silicone) 2/6/2017
07 61 13.docx Standing Seam Sheet Metal Roofing 2/6/2017
07 63 00.docxSheet Metal Roofing Specialties2/6/2017 
07 63 00.01.docx Sheet Metal Fluid Applied Roofing Specialties (For use with sections 07 57 13.01 & 07 57 13.02) 2/6/2017
07 84 00.docx Fire Stopping 12/1/2014
A2.1-A2.28.dwg Fully Adhered EPDM Details - ACAD 10/29/2015
A2.1-A2.28.pdf Fully Adhered EPDM Details - PDF 10/29/2015
A3.1-A3.27.dwg Built up Roofing Details - ACAD 10/1/2012
A3.1-A3.27.pdf Built up Roofing Details - PDF 10/1/2012
A4.1-A4.28.dwg Ballasted EPDM Details - ACAD 10/1/2012
A4.1-A4.28.pdf Ballasted EPDM Details - PDF 10/1/2012
A6.1-A6.25.dwg Spray Foam-Fluid Coating Details - ACAD 10/1/2012
A6.1-A6.25.pdf Spray Foam-Fluid Coating Details - PDF 10/1/2012
A7.1-A7.12.dwg Asphalt Shingle Details - ACAD 1/28/2015
A7.1-A7.12.pdf Asphalt Shingle Details - PDF 1/28/2015